STUDY OF BANK CAPACITOR NEEDS ANALYSIS OF POWER FACTOR IMPROVEMENT IN THE WATER INTAKE UNIT OF PT PUPUK ISKANDAR MUDA (PT PIM)

  • Hari Bukti Faculty of Science and Technology, Program Study Electrical Engineering
  • Hamdani Hamdani Faculty of Science and Technology, Program Study Electrical Engineering
  • Siti Anisah Faculty of Science and Technology, Program Study Electrical Engineering
Keywords: Capacitor Bank, Power Factor

Abstract

The used of an electric motor which is an inductive load will cause reactive power which can reduce the value of the power factor. This can have an impact on increasing the electric power bills charged to users due to the kVar pinalty given by PT PLN (Persero) as a power supplier company. This paper aims to analyze the need for a capacitor bank to improve the power factor of the PT PIM water intake unit. Based on the results of data analysis that has been carried out, it is found that the value of the power factor (Cosφ1) at the Water Intake Unit of PT PIM for the last six months has an average value of 0.76 so that a reactive power compensator from a capacitor bank of 154 kVar is needed to achieve a power factor of 0.85

Downloads

Download data is not yet available.

References

[1] Aryza, S., Irwanto, M., Lubis, Z., Siahaan, A. P. U., Rahim, R., & Furqan, M. (2018). A Novelty Design Of Minimization Of Electrical Losses In A Vector Controlled Induction Machine Drive. In IOP Conference Series: Materials Science and Engineering (Vol. 300, No. 1, p. 012067). IOP Publishing.
[2] Aryza, S., Irwanto, M., Lubis, Z., Putera, A., & Siahaan, U. (2017). A Novelty Stability Of Electrical System Single Machine Based Runge Kutta Orde 4 Method. IOSR J. Electr. Electron. Eng. Ver. II, 12(4), 2278-1676.
[3] https://www.academia.edu/31661406/unit utilitas pada pabrik pupuk iskandar muda aceh
[4] Christopher and Mark F., “Interpretation and Analysis of Power Quality Measurements” Electrotek Concepts,Inc.
[5] Aulia.B, O.Penangsang, and Ni Ketut., “Optimalisasi Penempatan Kapasitor Bank untuk Memperbaiki Kualitas Daya Pada Sistem Kelistrikan PT Semen Indonesia Aceh Meggunakan Metode Genetic Algorithm”, Jurnal Teknik ITS,Surabaya, 2016.
[6] Maulana.N,“Studi Analisis Penambahan Kapasitor Bank Pada Sistem Pembangkit PT PJB UBJO&M PLTU Paiton 9 dan Pengaruhnya pada Pola Operasi”, ITS, Surabaya, 2017.
[7] M.Hakim“Analisis Kebutuhan Capacitor Bank Beserta Implementasinya untuk Memperbaiki Faktor Daya Listrik di Politeknik Kota Malang”, Politeknik Kota Malang, Malang, 2014.
[8] ABB Group., “ABB Power Quality Products – Improved Energy Eficiency Through Harmonic Mitigation and PF Correction”, 2015.
Published
2022-06-30
How to Cite
Hari Bukti, Hamdani, H., & Anisah, S. (2022). STUDY OF BANK CAPACITOR NEEDS ANALYSIS OF POWER FACTOR IMPROVEMENT IN THE WATER INTAKE UNIT OF PT PUPUK ISKANDAR MUDA (PT PIM). INFOKUM, 10(02), 1216-1221. Retrieved from http://infor.seaninstitute.org/index.php/infokum/article/view/628