AN ANALYSIS OF NETWORK EXPANSION TO REPAIR VOLTAGE DROPS ON SULUM FEEDER DISTRIBUTION NETWORK PT PLN (PERSERO) KUALA SIMPANG CUSTOMER SERVICE UNIT
Abstract
In improving the voltage drop, PLN had tried several methods such as adding substations or commonly referred to as insertion substations, but the results are still unsatisfactory, current actions to maintain the quality of electricity distribution are being carried out by PT. PLN Persero Main Unit Aceh Region UP3 Langsa ULP Kuala Simpang is to expand a network by diverting the voltage source from the Pulo Tiga Substation which is 43 km from the Substation to the Terban Substation which is 12 km from the closer Substation so that it can change a voltage, which was initially small because at the end of the network it became much larger because it was at the base of the network which was close to the voltage source itself.Based on the data collected, the Sulum feeder experienced large enough voltage drop, namely 26.74% for the daytime peak load and 19.2% for the night peak load before switching the voltage source. After switching the voltage source, the value of the voltage drop is reduced to 3.6% for peak day loads and 4.1% for peak night loads
Downloads
References
[2]. Kadir, Abdul. 2000.Distribusi dan Utilisasi Tenaga Listrik. Jakarta: Universitas Indonesia
[3]. Putri, M., & Aryza, S. (2018). Design of security tools using sensor Light Dependent Resistor (LDR) through mobile phone. Int. J. Innov. Res. in Comp. and Comm. Eng, 4(10), 168-173.
[4]. Suhadi, dkk. 2008. Teknik Distribusi Tenaga Listrik Jilid 1. Jakarta : Direktorat Pembinaan Sekolah Menengah Kejuruan.
[5]. Suswanto, Daman. 2009. Sistem Distribusi Tenaga Listrik, Edisi Pertama. UNP.
[6]. heraja.B.L, Worked Examples In Electrical Technology, Techouse, 1983, Hal.261
[7]. tevenson, Wiliam D, Analisis Sistem Tenaga Listrik, Edisi Keempat.
[8]. Zuhal. 1995. Dasar Teknik Tenaga Listrik dan Elektronika Daya. Jakarta: Gramedia.